New automatic doors in Noatum Container

5/9/2017

New automatic doors in Noatum Container, in the Bilbao Terminal.

Central Breakwater of the expansion of the Port of Bilbao and the stabilization quarry of Punta Luce

5/9/2017

Central breakwater of the expansion of the Port of Bilbao (1st phase) and stabilization of the western sector of the Punta Lucero qu

Execution of 14 single-family homes in the sector of Bela in Sopela

5/2/2017

The fourteen semi-detached houses on the ground floor have a common basement for storerooms and garages.

Connection N-637 with N-633 and BI-737. Sense Rontegi-Mungia

6/2/2016

Conditioning of the link of Derio with various actions including the adaptation of the N-633 thanks to a new lower passage that allows circulation through two lanes, which will reduce the current high density.?